
Load time analysis
We measure up to three page types under documented conditions and show your developer where to start.
Up to three agreed changes to your existing frontend. We work in a test environment and document the results.
Your enquiry is non-binding. An order is created only when you accept our quotation .




The menu responds slowly or the product page jumps while loading. If the problem is already defined, we implement up to three agreed changes to the existing frontend: the part of your website visitors use in the browser.
Before starting, we define the problem and test conditions. For a jumping product page, for example, we record when the shift occurs. Implementation takes place in a test environment, also called staging, or a separate development branch. Your team can review the change before adopting it in production.
You receive the changes with a documented before-and-after test and adoption notes. The test report states which functions were checked. If the cause is still unknown, we first clarify the analysis required.
The report identifies a slow selector, but nobody has time to fix it. We review the finding and define the behaviour the change should achieve.
After invalid input, the form jumps upwards while the error message remains below. The fault is reproducible. We clarify which component and states need work.
Your website should remain accessible while work proceeds. The change is created in staging or a separate branch. Before starting, we clarify how your team will review and then adopt it.
We check whether the issue can be resolved through the agreed measures within the effort limit. Required access is clarified beforehand. If the scope is insufficient, we discuss this before additional work begins.
We implement changes in staging or a separate branch. For handover, we record relevant dependencies and decisions so your team can review and adopt the change.
We test the agreed behaviour under defined conditions and document what changed. This does not automatically approve other functions, browsers, security aspects or production conditions.

At handover, run through the documented test yourself and compare it with the agreed goal. The follow-up round clarifies open adoption steps; your team decides on publication.
Record a process we can reproduce: which page do you open, what do you click and what happens next? For operational questions, name the tools used and describe how changes reach the server.
Passwords, repository tokens and production data must not be included in the enquiry. We agree required documents and suitable access separately.
What is included, what do you need and what happens after your enquiry?
The process in detail →Following a suitability review, implementation can take place in the existing project. Structure, access and adoption method must be agreed. A particular framework alone does not determine whether the goal can be addressed within the package.
No. Implementation is first provided in staging or a separate branch. Publishing is a separate step to agree. No unrequested changes are made to the running product.
The package covers the confirmed improvement goal and agreed measures. Ongoing maintenance, additional bug fixes and new features are not automatically included. Further work is separately agreed before it starts.
State the framework, versions and deployment method in your enquiry. The suitability review determines whether the project fits the intended scope. A search result for React, Vue or another tool is not a blanket promise for every possible configuration.
Newly discovered problems do not automatically become part of the commission. We first clarify whether they concern the agreed goal or need additional scope. This keeps included work and decisions requiring separate approval clear.
Suitability, the specific effort limit and the work window are confirmed before commissioning.
An existing frontend and a clearly testable goal Technical suitability and effort limit confirmed in writing before commissioning Authorised code and test-environment access only after commissioning Credentials must not be included in the enquiry. Details are agreed only after written commissioning.
One written follow-up round is included. The service scope lists the analyses, designs or technical changes covered by the package. We agree additional work with you before it begins.
A faster page has no fixed monetary value. Connect measurement, the affected user journey and implementation costs to make a verifiable decision.
Read the guide ↗
We measure up to three page types under documented conditions and show your developer where to start.

Do you really need a rebuild? We review an application's structure and explain what to keep or change.