
Analytics data check
We review one analytics property for data gaps and conflicting figures.
VAT-exempt under section 19 of the German VAT Act




Missing or duplicate events? We correct your measurement setup and test whether it respects the visitor's consent choice.
Non-binding enquiry. Work starts only after you accept our offer.

The store works, but an event that used to be recorded no longer arrives. We check the trigger in the affected theme and the path through to the measurement request.
You reject analytics but still see requests to the measurement system. We distinguish loaded scripts from data actually transmitted and inspect the request contents.
We define up to five events and the existing consent signals.
We address up to three agreed technical causes in a suitable test environment.
We repeat the agreed paths before a banner choice and after rejection, acceptance and withdrawal.
Possible overlaps with: Analytics data check, Frontend optimisation. For a combined enquiry, we agree any overlapping work before commissioning.
Do not send passwords or tokens.
Compare your own assumptions with the costs of analysis and implementation.
Calculate your own scenarioWhat is included, what do you need and what happens after your enquiry?
The process in detailNo. If the fault and technical scope are already clear, you can request the repair directly. We take account of areas already investigated in a data check rather than charge for the same review again.
Unrecorded events cannot be recreated retrospectively through this repair. The work concerns future collection. We document known gaps so your team does not unknowingly compare old and new figures.
The package covers one GA4 or Matomo property and its technical consent handling. New advertising integrations, campaigns and a new server-side measurement infrastructure are not included.
No. A script can be loaded without sending a measurement event. We therefore inspect network requests, their contents and consent signals together. A visible script name alone is not enough to establish a finding.
Before commissioning, we check whether the affected area can be changed. We document platform or app faults we cannot edit with a reproducible test case. We cannot require a third-party provider to make a change.
We agree the delivery date after reviewing the affected environment, before you commission the work.
An accessible website and a specific list of affected events or discrepancies After commissioning, suitable access to the website, banner and measurement system, plus a way to test Consent purposes confirmed by you; do not send credentials through the enquiry form Credentials must not be included in the enquiry. Details are agreed only after written commissioning.
One written follow-up round is included. The service scope lists the analyses, designs or technical changes covered by the package. We agree additional work with you before it begins.